PROCEDURE
tar
Products Required
- Bridgepoint Gel Break™
- Bridgepoint Avenge Pro™
- Bridgepoint Spot Stop™
Procedures
- Scrape off any solids that can be removed.
- Apply Gel Break to cover the spot. Agitate with Gum Getter to aid penetration.
- Allow 10 minute dwell time.
- Apply Avenge Pro. Agitate.
- Extract with very hot water. Make dry passes.
- Mist on Spot Stop, brush in with Whiz Groom.
NOTE: Over time, asphalt and other petroleum products bond to olefin fibers and oxidize. Some asphalt yellowing will be permanent if carpets are not cared for regularly.