tar

Duy

PROCEDURE

tar

Products Required

  • Bridgepoint Gel Break™
  • Bridgepoint Avenge Pro™
  • Bridgepoint Spot Stop™

Procedures

  1. Scrape off any solids that can be removed.
  2. Apply Gel Break to cover the spot. Agitate with Gum Getter to aid penetration.
  3. Allow 10 minute dwell time.
  4. Apply Avenge Pro. Agitate.
  5. Extract with very hot water. Make dry passes.
  6. Mist on Spot Stop, brush in with Whiz Groom.

NOTE: Over time, asphalt and other petroleum products bond to olefin fibers and oxidize. Some asphalt yellowing will be permanent if carpets are not cared for regularly.