PROCEDURE
ceiling texture
Products Required
- Bridgepoint Avenge Pro™
- Bridgepoint Spot Stop™
Procedures
- Apply Avenge Pro.
- Agitate lightly to emulsify compound.
- Rinse thoroughly with hot water.
- Mist with Spot Stop, and brush in with a Whiz Groom.
PROCEDURE
Products Required
Procedures